Laurent, Thereza Kakili
(2017)
Factors Affecting Performance of Airport Construction in Tanzania.
Masters thesis, The Open University of Tanzania.
Abstract
Project Performance can be measured and evaluated using performance indicators such as time, cost, quality, client satisfaction, client changes, business performance, health and safety. For that case Performance can be assured by identifying and eliminating the factors that cause poor project outcomes. The objective of the study was to analyze the factors affecting performance of airport construction project in Tanzania. The study focuses on the major airport construction project done in Tanzania. The whole populations of 103 respondents were used based on available data base of key professional staffs and stakeholders on managerial. Inferential and descriptive statistics were used for data presentation and findings. Statistical Package for Social Sciences (SPSS) version 16 was used for analysis data analysis. The study revealed that failure in releasing project fund on time causes project poor performance, failure in involvement stakeholder input leads the project into subsequent design a change which leads the project to running behind schedule and over budget and Contractor with poor project management skill causes project failure. All project team should have project management skills and regularly training since airport projects are complex in nature and implementation.
Key words: Project performance, quality, scope, budget and schedule
Actions (login required)
|
View Item |